Asphalt roofs including built up Roofs (BUR) , Hot tar, modified bitumen (mid bit) and granulated cap sheet are mound the hardest roof systems to repair. Few coating systems will provide adhesion, system warranties and outstanding performance over roofing products with Asphalt components. This leaves many residential and commercial building owners to chose from a coating that will fail, a leaky roof or spending tens of thousands if not hundreds of thousands on re-roofing, roof repairs and coating products. Our product performs over Asphalt at a fraction of the price
RC5000 series will perform over Asphalt roofs, modified bitumen, mod bit, granulated cap sheet, roll out roofing, torch down roofing, hot tar and other Asphalt and modified asphalt roofing components. It will also coat and waterproof flashing and penetrations.
Regardless of the system being used, all systems require a structurally sound substrate that is clean and dry. Surface should be free of any grease, oil or other contaminants. A three layer system shall be applied at all roof penetrations, equipment, drains, waterways, areas known to have ponding water and the perimeter of the roof. A layer of fabric should be embedded in RC4000BC and top coated with two layers of RC5000CRC to create the three layer system.
Important Note for Warranty and Non Warranty Systems: The number of coats is generally based on a sprayer application. If you are using a roller, we suggest multiple coats to achieve the same amount of material. The product can effectively be rolled on at a rate of 75-100 Sq. Ft. per gallon (1 - 1.5 gallons per square)
Regardless of the system being used, all systems require a structurally sound substrate that is clean and dry. Surface should be free of any grease, oil or other contaminants. A three layer system shall be applied at all roof penetrations, equipment, drains, waterways, areas known to have ponding water and the perimeter of the roof. A layer of fabric should be embedded in RC4000BC and top coated with two layers of RC5000CRC to create the three layer system.
Qualifying applications can receive a 10 year material only limited warranty. To receive this warranty you must use the systems illustrated below. You must apply for the warranty and submit the required documentation. This may include project photos before, during and after the project. We reserve the right to require inspections.
Regardless of the system being used, all systems require a structurally sound substrate that is clean and dry. Surface should be free of any grease, oil or other contaminants. A three layer system shall be applied at all roof penetrations, equipment, drains, waterways, areas known to have ponding water and the perimeter of the roof. A layer of fabric should be embedded in RC4000BC and top coated with two layers of RC5000CRC to create the three layer system.
SKU | RC5000ASP |
---|